Tuesday, August 18, 2009

Lab 2

This afternoon was having Drilling Engineering Lab 2. (last lab)

This is a Drilling Stimulation
which we were supposed to control the subsurface pressure to prevent Blow Out.

It should be very fun coz it was like playing a Game Station.

But...maybe too much people already, I didn't have mood to touch even a button there.

Instead, I saw a lot of inquiries and kept on asking the lab demo until he seem frustrated!!!

Haha... So basically this is the machine we dealt with today~

No comments:

Post a Comment